'59 Project January-February 2005


Click on a photo to view a larger image. 
A new copy of your browser will be launched to view the image.  
Click on the exit button to return to this page.

t_02050501.jpg (5940 bytes)

Wheel covers are held in place by a threaded rod in the spinner.   The threaded rod screws into a nut in the center of an aluminum plate mounted in the center of the '98 Corvette rim.

 

 t_02050505.jpg (4220 bytes)

The wheelcover mounted on the wheel.  It is primed and sanded and ready for the second coat of primer.

 

t_02050506.jpg (5062 bytes)   t_02050511.jpg (6483 bytes)   t_02050512.jpg (6848 bytes)

The new 572 crate engine arrived today.

 

t_02200515.jpg (6375 bytes)

Lifting the engine into place.

 

t_02200517.jpg (7460 bytes)

Engine and transmission roughed in.

 

t_02250518.jpg (6851 bytes)

Test fitting the body with engine/transmission in place.    So far it looks like the only serious clearance problem will be routing the exhaust from the #1 and #3 cylinders, around the steering column.

 

t_02250521.jpg (5994 bytes)

Checking out the seating position.

 

t_02250525.jpg (5914 bytes)

The view from underneath.  Looks like plenty of room for the transmission.

 

next page